Design of FMEA document
Design FMEA is used in the design process by
identifying known and foreseeable failure modes and then ranking failures
according to relative impact on the product. Design FMEA reduces development
time and cost of manufacturing process by eliminating many potential failure
modes prior to operation of the process.
FMEA number space is given on the top right corner
of the document which is needed for reference.
ITEM
space is used for component (or) process to be analysed.
Design Responsibility space is used for the team
in-charge of the design or process , (or) the name and the department of the
person responsible for preparing the document.
Model Number / Year of the component should be included
in the space provided to avoid confusion between similar components.
Key date
space is used for initial Due date of FMEA.
FMEA date –original
and FEMA date latest revision should be filled. In the Core team space, the
names of the responsible individuals and
departments having authority to
perform tasks should be filled up. Item/Function :
In this column, the name and code number of the
item being analysed is recorded.
This
function of the item should be entered.
If the item has more than one function, they
should be listed and analysed separately.
The environment (temperature. pressure, humidity
etc) in which the system operates should be completely given.
Related Topics
Privacy Policy, Terms and Conditions, DMCA Policy and Compliant
Copyright © 2018-2023 BrainKart.com; All Rights Reserved. Developed by Therithal info, Chennai.