Home | | Aquaculture Engineering | Finishing plans, detailed planning - Planning Aquaculture Facilities

Chapter: Aquaculture Engineering - Design and Construction of Aquaculture Facilities

Study Material, Lecturing Notes, Assignment, Reference, Wiki description explanation, brief detail

Finishing plans, detailed planning - Planning Aquaculture Facilities

After choosing a solution, this can be further developed, by preparing more detailed plans and drawings of constructions and/or buildings.

Finishing plans, detailed planning


After choosing a solution, this can be further developed, by preparing more detailed plans and drawings of constructions and/or buildings. Here more detailed design of the necessary components is also included and, based on this, a more detailed calculation of the costs. This is labour-intensive. It may also be a two-step planning process with a pilot planning project followed by the detailed planning process.

The next step is usually to draw up invitations to tender with the necessary descriptions. When a tender is accepted, the building process can start. During the building process is it important to check progress regularly.

Study Material, Lecturing Notes, Assignment, Reference, Wiki description explanation, brief detail


Copyright © 2018-2020 BrainKart.com; All Rights Reserved. Developed by Therithal info, Chennai.