Control of mooring systems
After setting out the mooring
system, it is important to do necessary checks to avoid breakages. Insurance
companies will normally require some type of checking of the mooring system.
There may also be national standards to prevent breakage and possible escape of
fish. For instance the following may be used:
· The supplier’s
specification must be used to set out the cage Parts in the mooring system
above the surface must be checked daily
· The whole
mooring system including under water installations must be checked every year.
Some time after
the mooring system was first set out, a more comprehensive and systematic check
should be carried out, for instance every 4 years. This includes load tests on
important and heavily loaded parts. Components exposed to hard wear should be
replaced, such as mooring ropes, chain, wire, fixing points and eventually
links.
Related Topics
Privacy Policy, Terms and Conditions, DMCA Policy and Compliant
Copyright © 2018-2023 BrainKart.com; All Rights Reserved. Developed by Therithal info, Chennai.