Renewal of Rail Track: Requirement of Track Material

It is important that the exact quantities of track material are conveyed to the site. Any excess material gets wasted, whereas shortage of material results in difficulties and delays in carrying out renewal work.

Requirement of Track Material

 

It is important that the exact quantities of track material are conveyed to the site. Any excess material gets wasted, whereas shortage of material results in difficulties and delays in carrying out renewal work. It is normally desirable to have a small spare stock of extra material ready in case of unforeseen contingencies.

 

The exact quantity of material required for 1 km of track is calculated as given below.

 

If the track is an ST sleeper track with 52-kg rails and sleeper density M + 7 (where M is the length of the rail in metres, which is normally 13 m on BG), then the calculations are as follows.

 

Rails



Fish bolts Each joint requires four fish bolts:

 

Number of fish bolts = 4 × number of rails per km = 4 × 154 = 516

 

Fish plates Each joint requires two fish plates:

 

Number of fish plates = 2 × number of rails per km = 2 × 154 = 308

 

Keys Four keys are required per sleeper:

 

Number of keys = 4 × 1540 = 5160

 

Loose jaws Four loose jaws are required per sleeper:

 

Number of loose jaws = 1540 × 4 = 5160

 

Study Material, Lecturing Notes, Assignment, Reference, Wiki description explanation, brief detail
Civil : Railway Airport Harbour Engineering : Railway Engineering : Rehabilitation and Renewal of Track : Renewal of Rail Track: Requirement of Track Material |


Privacy Policy, Terms and Conditions, DMCA Policy and Compliant

Copyright © 2018-2024 BrainKart.com; All Rights Reserved. Developed by Therithal info, Chennai.