1. Design a
one way slab with a clear span of 5m, simply supported on 230mm thick masonry
walls and subjected to a live load of 4kN/m2 and a surface
finish of
1kN/mm2.Assume Fe 415 steel. Assume that the slab is subjected to
moderate exposure conditions.
Step 1: Type of Slab.
ly/lx = 5/1 = 5>2.it has to be
designed as one way slab.
Step 2:Effective depth
calculation.
d =
span/(basic value x modification factor) = 5000/(20x0.95) = 270mm D = 270 + 20
+ 10/2 = 295mm
Step 3: Effective Span.
Le =
clear span + effective depth = 5000 + 270 = 5.27m (or) Le =c/c distance b/w
supports = 5000 + 2(230/2) = 5.23m Adopt effective span = 5.23m least value.
Step 4:
load calculation Live load = 4kN/m2
Dead load = 1x1x0.27x25 =
6.75kN/m2
Floor Finish = 1kN/m2
Total load = 11.75kN/m2
Factored load = 11.75 x 1.5 =
17.625kN/m2
Step 5: Moment calculation.
M = wl2/8
= (17.625x5.232)/8 = 60.26kNm Step 6: Check for effective depth.
M = Qbd2
d2
= M/Qb = 60.26/2.76x1 = 149.39mm say 150mm. For design consideration adopt d =
150mm.
Step 7: Area of Steel.
Mu = 0.87 fy Ast d (1- (fy ast)/(fck b d)) 60.26x106
= 087x415xAstx150(1-(415 Ast)/(20x1000x150)) Ast = 300mm2
Use 10mm dia bars
Spacing ,S = ast/Astx1000 = (78.53/300)1000 = 261mm say
260mmc/c Provide 10mm dia @260mm c/c.
2. Design a simply supported RC beam having an
effective span of 5m.the beam has
to carry
a load of 25 kN/m. sketch the reinforcement details.
Step 1:
Effective length. Effective span,le = 5m Step 2: Size of the
beam.
Effective
depth = le/10 = 5000/10 = 500mm Assume, b = 2/3d = 2/3x500 = 333.2mm say 340mm Step
3: Load Calculation
Live load = 25kN/m
Dead load
= 1x.340x.500x25 = 4.25kN/m Total load = 29.25kN/m
Factored
load = 29.25x1.5 = 43.85kN/m Step 4: Moment Calculation.
M = wl2/8
= (43.85x52)/8 = 137.08kNm Step 5: Check for effective depth.
M = Qbd2
d2
= M/Qb = 137.08/2.76x.340 = 382.2mm say 380mm. d = 380mm > 500mm
Hence it is safe.
Step 5: Check for effective
depth.
Mbal = Qbd2
= 2.97x340x5002 = 252.06kNm > M
Hence it
can be designed as singly reinforced beam section. Step 6: Area of Steel
Mu = 0.87 fy Ast d (1- (fy
ast)/(fck b d))
137.08x106
= 087x415xAstx500(1-(415 Ast)/(20x340x500)) Ast = 846.15mm2
Use 20mm dia bars
No of bars = Ast/ast =
846.15/314.15 = 2.45 say 3nos Provide 3#20mm dia as tension reinforcement.
3. Design a
RC beam 350X700mm effective section, subjected to a bending moment of
300kNm.Adopt M20concrete and Fe415 steel.
Step 1:
Size of the beam. b = 350mm & D = 700mm d = 700-25-20/2 =665mm
Step 2:
Moment Calculation. M = 300kNm
Step 3:
Check for effective depth.
Mbal
= Qbd2 = 2.97x350x6652 = 459kNm > M
Hence it
can be designed as singly reinforced beam section. Step 7: Area of Steel
Mu = 0.87
fy Ast d (1- (fy ast)/(fck b d))
459x106
= 087x415xAstx665(1-(415 Ast)/(20x350x665)) Ast = 369.38 mm2
Use 20mm
dia bars
No of
bars = Ast/ast = 369.39/314.15 = 1.45 say 2nos Provide 2#20mm dia as tension
reinforcement.
4. Design a
one way slab for a clear span 4m simply supported on 230mm thick wall.
Subjected to a live load of 4kN/m2 and floor finish of 1kN/m2.use
M20 concrete and F415 steel.
Step 1: Type of Slab.
ly/lx =
4/1 = 4>2.it has to be designed as one way slab. Step 2:Effective depth
calculation.
d =
span/(basic value x modification factor) = 4000/(20x0.95) = 270mm D = 270 + 20
+ 10/2 = 295mm
Step 3: Effective Span.
Le = clear span + effective depth
= 4000 + 270 = 4.27m (or)
Le =c/c
distance b/w supports = 4000 + 2(230/2) = 4.23m Adopt effective span = 4.23m
least value.
Step 4:
load calculation Live load = 4kN/m2
Dead load = 1x1x0.27x25 =
6.75kN/m2
Floor Finish = 1kN/m2
Total load = 11.75kN/m2
Factored load = 11.75 x
1.5 = 17.625kN/m2
Step 5: Moment
calculation.
M = wl2/8
= (17.625x4.232)/8 = 60.26kNm Step 6: Check for effective depth.
M = Qbd2
d2
= M/Qb = 60.26/2.76x1 = 149.39mm say 150mm. For design consideration adopt d =
150mm.
Step 7: Area of Steel.
Mu = 0.87 fy Ast d (1- (fy
ast)/(fck b d))
60.26x106
= 087x415xAstx150(1-(415 Ast)/(20x1000x150)) Ast = 300mm2
Use 10mm dia bars
Spacing
,S = ast/Astx1000 = (78.53/300)1000 = 261mm say 260mmc/c Provide 10mm dia
@260mm c/c.
5. Deign a
rectangular beam of cross section 230 x 600 mm and of effective span 6m.imposed
load on the beam is 40 kN/m. Use M20 concrete and Fe415 steel.
Step 1:
Size of the beam.
b = 230mm & D = 600mm d =
600-25-20/2 =565mm Step 4: load calculation Live load = 40kN/m2
Dead load
= 1x.23x.565x25 = 3.245kN/m2
Total
load = 43.24kN/m2
Factored
load = 43.24 x 1.5 = 64.86kN/m2
Step 2:
Moment Calculation.
M = wl2/8
= (64.86x62)/8 = 291.9kNm
Step 3:
Check for effective depth.
Mbal
= Qbd2 = 2.97x230x5652 = 218kNm < M
Hence it
can be designed as Doubly reinforced beam section.
Step 7:
Area of Steel
Ast = Ast1
+ Ast2
Mu = 0.87
fy Ast d (1- (fy ast)/(fck b d))
218x106 = 087x415xAstx565 (1-(415 Ast)/
(20x230x565)) Ast = 1365mm2
Use 20mm
dia bars, ast = ?/4 (202) = 314.15mm2
No. of
bars = Ast/ast = 1365/314.15 = 4.47 say 5nos.
Ast2
= (M-Mbal)/(0.87fy(d-d1)) = (291x106-218x106)/(361x(565-20))
=371.03mm2
Use 20mm
dia bars, ast = ?/4 (202) = 314.15mm2
No. of
bars = Ast/ast = 371.03/314.15 = 1.8 say 2nos.
Step 5:
Area of Compression steel:
Asc = (M-Mbal) / (fsc.(d-d1)) = (291x106-218x106)
/ (351.8x(470-30))= 1580.65 mm2
Use 20mm
dia bars, ast = ?/4 (202) = 314.15mm2
No. of
bars = Ast/ast = 1580.65/314.15 = 5.5 say 6nos.
Provide 6#20mm dia bars as compression
reinforcement.
A hall has clear dimensions 3 m x 9m with wall thickness 230
mm the live load on the slab is 3kN/m2 and a finishing load of 1kN/m2
may be assumed. Using M20 concrete and Fe415 steel, design the slab.
Step 1: Type of Slab.
ly/lx =
9/3 = 3>2.it has to be designed as one way slab. Step 2:Effective depth
calculation.
d =
span/(basic value x modification factor) = 3000/(20x0.95) = 270mm D = 270 + 20
+ 10/2 = 295mm
Step 3: Effective Span.
Le =
clear span + effective depth = 3000 + 270 = 3.27m (or) Le =c/c distance b/w
supports = 3000 + 2(230/2) = 3.23m Adopt effective span = 3.23m least value.
Step 4:
load calculation Live load = 4kN/m2
Dead load = 1x1x0.27x25 =
6.75kN/m2
Floor Finish = 1kN/m2
Total load = 11.75kN/m2
Factored load = 11.75 x 1.5 =
17.625kN/m2
Step 5: Moment calculation.
M = wl2/8 =
(17.625x3.232)/8 = 60.26kNm
Step 6:
Check for effective depth. M = Qbd2
d2
= M/Qb = 60.26/2.76x1 = 149.39mm say 150mm. For design consideration adopt d =
150mm.
Step 7: Area of Steel.
Mu = 0.87 fy Ast d (1- (fy
ast)/(fck b d))
60.26x106
= 087x415xAstx150(1-(415 Ast)/(20x1000x150)) Ast = 300mm2
Use 10mm dia bars
Spacing ,S = ast/Astx1000
= (78.53/300)1000 = 261mm say 260mmc/c
Provide 10mm dia @260mm
c/c.
7. Design a
two way slab panel for the following data. Size = 7mx5m
Width of
Supports = 230 mm Edge condition = interior Live load = 4kN/m2
Floor
finish = 1kN/m2
Consider
M 20 grade concrete and Fe 415 grade steel. (MAY JUNE 2009) Step 1: Type of
Slab.
ly/lx =
7/5 = 1.4>2.it has to be designed as two way slab. Step 2:Effective depth
calculation.
For
Economic consideration adopt shorter span to design the slab.
d =
span/(basic value x modification factor) = 5000/(20x0.95) = 270mm D = 270 + 20
+ 10/2 = 295mm
Step 3:
Effective Span. For shorter span:
Le =
clear span + effective depth = 5000 + 270 = 5.27m (or) Le =c/c distance b/w
supports = 5000 + 2(230/2) = 5.23m
Adopt
effective span = 5.23m least value. For longer span:
Le =
clear span + effective depth = 7000 + 270 = 7.27m (or) Le =c/c distance b/w
supports = 7000 + 2(230/2) = 7.23m Adopt effective span = 7.23m least value.
Step 4: load calculation
Live load = 4kN/m2
Dead load = 1x1x0.27x25 =
6.75kN/m2
Floor
Finish = 1kN/m2
Total
load = 11.75kN/m2
Factored
load = 11.75 x 1.5 = 17.625kN/m2
Step 5:
Moment calculation.
Mx = ?x . w .
lx = 0.103x17.625x5.23 = 9.49kNm My =
?y . w . lx = 0.048 x17.625x5.23 = 4.425kNm
Step
6: Check for effective depth.
M = Qbd2
d2 = M/Qb = 9.49/2.76x1 = 149.39mm say 150mm. For
design consideration adopt d = 150mm.
Step 7: Area of Steel. For longer span:
Mu = 0.87
fy Ast d (1- (fy ast)/(fck b d))
4.425x106 = 087x415xAstx150(1-(415
Ast)/(20x1000x150)) Ast = 180mm2
Use 10mm
dia bars
Spacing ,S = ast/Astx1000 = (78.53/300)1000 = 261mm say
260mmc/c Provide 10mm dia @260mm c/c.
For
shorter span:
Mu = 0.87
fy Ast d (1- (fy ast)/(fck b d))
9.49x106 = 087x415xAstx150(1-(415 Ast)/(20x1000x150))
Ast = 200mm2
Use 10mm
dia bars
Spacing ,S = ast/Astx1000 =
(78.53/300)1000 = 281mm say 300mmc/c Provide 10mm dia @300mm c/c.