Sewage
Treatment: Septic Tank
Primary Sedimentation
Detention Period - 12 to 36 hours
Works on the principle of anaerobic decomposition
Rectangular type - constructed below GL
Removes about 60 to 70 % dissolved matter from it.
Design Considerations
Number of souls per house hold: 5
Number of fixture
per house hold: 1
% of unit discharge simultaneously : 60
Discharge from each sedimentation : 1 m2/10Lpm
of peak discharge
Minimum depth for sedimentation : 30cm
Related Topics
Privacy Policy, Terms and Conditions, DMCA Policy and Compliant
Copyright © 2018-2023 BrainKart.com; All Rights Reserved. Developed by Therithal info, Chennai.