Relationship between people and effort, Task Set & Network,
Scheduling, EVA
Software
engineering handles the relationship between people and effort management for
product development phase. These some points are as follows:-
1.
When software size is small single person can handle same project
by performing steps like requirement analysis, designing, code generation, and
testing etc.
2.
If the project is large additional people are required to complete.
the project in stipulated in time it become easy to complete project by
distributing work among people and get it done as early as possible.
3.
The communication path of new comer also increase as time increase
and day by day the project become extra complicated. And new customer gets
confusion become more after the days by days.
4.
It is possible to reduce a desire project completion date by
getting more people to same point. It also possible to expand the completion
date by reducing number of resources. And you can mention for the date of
completion.
5.
The Putnam norden Rayleigh (PNR) curve is an indication of
relationship which exists between effort applied and delivery time for software
project.
6.
The curve indicate a minimum time value at to which indicates test
cost time for delivery as use move to left to right. It is observed that curved
raised non-linearly.
7.
It is possible to make delivery fast; the curve rises very sharply
to left of td. The pnr curve indicates that project delivery time should not be
compressed much behind on td.
8.
The number of delivery lines of code are also known as source
statements L. Relationship of L with effort & development time by equation
can be described as
L= P *
E1/3 T ¾
Here ‘E’
represents development effort in person months, P is productivity
1.
After rearranging the last equation can arrive at an expansion for
development effort e.
E =
L3/(P3 T4)
E is
called as effort expanded over entire life cycle for software development and
maintenance
T is the
development period in years. And this equation is lead to
E = L3 /
(P3 T4) ~ 3.8 Person years.
This
shows that by extending last date of project with six month e.g. we can reduce
the no of people from eight to four. The outcome benefit can be gained by using
less number of people over longer time to achieve the same objective.
These
are all about the relationship between people and effort in software
engineering.
Description of People and process management
spectrum
The people:-
People
management capability maturity model (PM-CMM) has been developed by software
engineering institute.
The
people management capability maturity model defines following key practice area
for software people:-
·
Recruiting
·
Selection
·
Performance
·
Training
·
Team / culture development
·
Carrier development
It
guides organizations in a creation of mature software process. The various
groups are involved for the most needed communication and co-ordination issue
required for any effective software. These groups can be categorized as under:-
1)Stack
holder: – Those people who are involved in software process and every
software project. Stack holder can
be senior manager, project manager practitioner’s customer and end user.
2)Team
leader: – The MOI model of leadership state characteristics that define and
effective project manager
motivation, organization and ideas. Successful project leaders use problem
solving strategy.
3)Software
team:- The people directly involved in a software project are within
the software project manager scope
seven project factor should be considered when planning structure of software
engineering team these are as follows:-
·
Difficult of problem to be solved.
·
Size of resultant program.
·
Time that team will stay together.
·
The rigidity of a delivery date.
·
The degree of communication required for project.
4) Agile teams: it is very active team which is a very small highly
motivated project team consist of a informal method which result into overall
development simplicity. These are all about the people description.
The Process:-
A comprehensive plan for a
software development can be established from a software process framework. A
number of a different task based milestone, work product and quality assurance
points enables the frameworks activity to be adapted to characteristics of a
software project. The frame work activity that characteristics the software
processes are applicable to all software projects. The problem is to be
selected process model that is appropriate for software to be a engineered by a
software team.
The project manager must
decide which process mode is appropriate for 1) Customer who has a request
product 2) the characteristics of product 3) the project environment.
Once the primary plan is
established process decomposition begins a complete plan reflecting work task
required to populate to require to framework activities must be created. These
are all about process.
Process Decomposition:-
A software team should have
extent of adaptability in choosing the software process model which is a best
for a project and engineering task. A relatively small project might be a best
accomplished using linear frequent approach. If very tight time constraints are
imposed then problem can be a heavily compartmentalization RAD model. Project with
other characteristics will lead to the selection of a other process model. Once
a process model and process framework is decided then generic communication
framework communication, planning, modeling, construction and deployment can be
used. It will works for a linear model for iterative and incremental model, for
evolutionary model and for concurrent or concurrent assembly models.
Process decomposition
commence when the project manager asks how we accomplish the actual activity.
Process decomposition is appropriate for the small relatively and a simple
project for it. It should be noted work task s must be adapted to specific need
of a project. These are about the process decomposition in the software
engineering for product development activities.