Design and construction errors
Misconceptions of Structural Action
Design procedures often include
simplifying assumptions as to the way, in which the final structure will
behave. It the designer does not ensure that the structure can, in fact, behave
in the assumed way, cracking occurs to the extent necessary. A common example
is when moment free condition is assumed and not achieved. A wall-floor joint
in a 1 Million Liter water tank is shown fig. In the design of the tank, this
joint had been assumed to behave as a pin, but the face marked bitumen paint
did not have enough separation.
As a result, when the tank wall
rotated under water load, the faces came into contact and the corner behaved as
a knee-joint, transmitting moment. The compression components of this moment
produced a diagonal tensile
Resultant, which caused a
substantial piece of un-reinforced concrete to spall off, as shown in figure
and exposed reinforcement then corroded.
When connected members have very
different rigidities forces may tend to migrate from the path, provided by the
designer into an alternative rigid member.
The primary beam shown in the
figure below as to transfer the negative moments from the secondary beams, to
the supporting columns.
As the columns and the primary
beams are both stiff members, this transfer involves a torque in the primary
beam, for which torsion reinforcement is needed. When this reinforcement was
omitted from the design, helical cracks appeared.
Reinforcement Detailing
Inadequate detailing of
reinforcement is a wideparead cause of cracking and particularly of those
severe cracks, which affect the limit state of collapse
Designers given the opportunity,
learn from experience and in many organizations, this source of trouble is
steadily reduced. Members, which appear to be particularly susceptible to
severe cracking as a result of insufficient steel or broadly arranged steel,
are those which carry local loads, such as corbles, supports for bridge
bearings, walls supporting column bases, pre-stressing anchorages and column
capitals.
Conventional drawings tend to
ignore the physical size of the bars, and the limitations on bend shape in
practical reinforcing. Equally important is the need, to ensure that the steel
is incorporated in the way it was designed.
Extensive tests on corbles
identified 6 different failure mechanisms, which may occur and against which,
reinforcement is needed. An arrangement of reinforcing which takes account of
these potential failure modes in shown in the figure below. A very common
source of trouble arises from locating the outer edge of the bearing, beyond
where the steel can possibly be located. The designer should ensure that with
normal tolerances on steel bending and placing, there is still adequate steel
located outside the edge of the bearing, when it is located at the extreme of
its tolerance.
Some arrangements of
reinforcement actually cracks, and these should be carefully avoided. For
example severe cracking can be seen, when all the top bars in a slab are
terminate at the same cross section.
Construction Errors
Construction & supervision
deficiencies are the major cause of defects, leading to cracking. It has been
found that 36% of the defects were due to these causes. A well-known expect on
structural failures said that, he never found a failure caused by poor
concrete, but he had never investigated one that did not contain poor or
interior concrete. This comment related to collapses of structures, but when
the definition of failure is extended as we are doing here, the quality of
concrete does become much more important. For example, the protection afforded
to steel is greatly of concrete depended on the compaction & curing of the
cover concrete.
Survey revealed that construction defects could be
grouped into 4 classes.
A. Deficiencies
in the control of concrete materials, batching & mixing
ü Use of salt water as mixing water ü Excess fines in the aggregates
B. Inadequate
preparation before concreting.
ü Salt
water contamination of reinforcement
ü Lack of
cover to reinforcement
C. Inadequacies
of placing & subsequent treatment
ü Plastic cracking & settlement
cracking ü Lack of curing
D. Faults of
construction planning &procedure
ü Overloading of members by
construction loads ü Loading
of partially constructed members
ü Differential shrinkage between
section of construction ü Omission
of designed movement joints
ü Unexpected behavior and restraint
during prestressing